Assignment Details


·  Pre – Feasibility Report of Underground Parking Place in Mussoorrie.

·  Prepared Detailed Project Report for protection/ treatment and Slope Stabilization works Near Holy Cave for Shri Amarnathji Shrine Board, Srinagar, J&K.

·  Slope Stabilization DPRs for 5 Locations submitted by M/s WAPCOS to the Government of Uttarakhand.

·  Prepared Detailed Project Report (DPR) for Grid connected Solar Power Project of 20 MW capacity at Cheetakhera in District : Nimach (M.P) .

·  Power Potential and E&M Studies of Hydro Power Project under Damanganga – Pinjal Link Project for Bhugad Dam and Reservoir.

·    Power Potential and E&M Studies of Hydro Power Project under Damanganga – Pinjal Link Project for Khargihill Dam and Reservoir.

·  Design and Engineering measures for Stabilization of vulnerable zones between Katra and Shri Mata Vaishno Deviji Shrine”.

·  Design and Engineering measures for Stabilization of Chronic Slide Zones on 20 various Road locations in the Uttarakhand.

·  Design and Engineering measures for Stabilization of Chronic Slip zone on slope adjoining Rajbhawan, Nainital for immediate measures (Phase-I), and comprehensive scheme (Phase-II).

·  Design and Engineering solution for the hill stabilization problem of Varunavat Parvat in Uttarkashi, Uttarakhand for GoUK as well as supervision of work.

·  Design and Engineering solution for the hill stabilization problem of Tambakhani chute treatment work in Uttarkashi, Uttarakhand for GoUK.

·  Preparation of report on Indravati River Basin based on an Integrated Basin concept for Chhattisgarh State Power Generation Co. Ltd.(CSPGCL)

·   Power Potential and E&M Studies for 06 Nos. Hydel Projects proposed under Par – Tapi – Narmada Link Project for preparation of Detailed Project Report (DPR) developed by National Water Development Agency

·  THDCIL had organized 5 days “Comprehensive Training Programme on Hydro Power Development” for NTPC Ltd. Officials.).