CONSULTANCY WORKS AWARDED TO THDCIL– DETAILS AND STATUS
SI. NO Name of Agency Date of Request Estimated Cost (Rs in Lakhs) Scope of Work
1.        Govt of Uttarakhand Jan ‘2004 Social service. Complete engineering solution to GoUK for the hill stabilization problem of Varunavat Parvat in Uttarkashi, Uttarakhand and also supervising the execution of works at site as social responsibility. The project is funded by Ministry of Home Affairs, Govt. of India.
2.       Govt of Uttarakhand.
 
(MOU WITH “UKPWD” FOR STABLIZATION OF 20 VULNARABLE CHRONIC SLIDE ZONES)
Sept ‘2013 Approx. 270 Complete engineering solutions to GoUK for the hill stabilization problem for 20 locations of various roads in Uttarakhand and technical monitoring during execution of works at site. The project is funded by World Bank and ADB. DPR for all 20 locations have already been submitted. Out of 20 locations, 11 have already been treated and the status of balance 9 locations are as follows.
 
Funding of balance other 5 locations have been proposed to be done by World Bank under URDP plan.
 
3.       Govt of Uttarakhand.
 
(MOU WITH “UKPWD” FOR UNDERGROUND PARKING AT MUSSOORIE & NAINITAL AND RAJ BHAWAN LANDSLIDE ZONE AT NAINITAL”)
26th June ‘2014 Approx. 270 RAJ BHAWAN LANDSLIDE ZONE AT NAINITAL
Treatment Work of Phase-I has been completed. DPR for comprehensive scheme (Phase-II) has been submitted to PWD, Nainital after vetting from IIT-Roorkee. DPR for comprehensive scheme (Phase-II) is under process of approval from GoU.
UNDERGROUND PARKING AT MUSSOORIE
Work of geotechnical investigation for underground parking for 100 vehicles at Mussoorie is kept on hold as advised by PWD.
4.       Shri Mata Vaishno Devi Shrine Board (SMVDSB) Katra, Jammu & Kashmir June 06 2011 Social service. Design and Engineering Measures for stabilization of vulnerable Zones between Katra and Shri Mata Vaishno Deviji Shrine
 
5.       National Water Development Agency (NWDA). 15 Nov 2011 19.83 Power Potential and E&M studies of likely power housed proposed under Damanganga – Pinjal link project
6.      Odisha Hydro Power Corporation Ltd. (OHPC Ltd.) 13 Feb 2012  
91.01
Preparation of Pre-feasibility reports for Pumped Storage Schemes in existing Power station of OHPC
7.       Chhatisgarh State Power Generation Co. Ltd.(CSPGCL) 29th Sept ‘2015 40.0 Preparation of report on Indravati River Basin based on an Integrated Basin concept.
8.       Govt of Uttarakhand.
(AGREEMENT BETWEEN THDCIL AND (PIU), TA & CBDRM UTTARAKHAND FOR VETTING OF DPR AND TENDER DOCUMENTS FOR THE SLOPE STABILIZATION OF 5 LOCATIONS IN UTTARAKHAND)
20th Feb. ‘2017 14.01 Vetting of the 5 locations of slope stabilization DPR to be submitted by M/s WAPCOS to the government of Uttarakhand. DPRs and tender documents of all 5 sites have been Techno-economically  vetted by THDCIL.
9.       Govt of Uttarakhand Jan ‘2017 21.00 Design and Engineering solution for Tambakhani Chute Treatment work in Uttarkashi, Uttarakhand (work is in progress)


CONSULTANCY WORKS IN PIPELINE
SI. No Name of Agency Date of Request Estimated Cost (Rs in lakhs) Scope of Work
1. Irrigation Deptt. of Uttarakhand C-150/CE (level-1), dtd. 03rd Aug. 2018 210  (Approx.) Preparation of DPRs for protection /treatment of 3 locations, viz. Harinagar-I&II, Kailakhan and Allukhet in District Nainital.