The Project comprise of 30 Wind Turbine Generators (WTGs) of 2.1 MW each, installed across seven villages in District Devbhumi Dwarka, Gujarat. Power from this Project is being provided to the State of Gujarat and was commissioned on 31 March 2017.

GENERAL FEATURES

ParticularsDetails
Capacity63 MW (30X2.1 MW)
LocationDevbhumi Dwarka, Gujarat
Expected Annual Energy Production (AEP)144.90 MU with 26.77% CUF
Commercial Operation Date31.03.2017
Beneficiary StatesGujarat

KEY TECHNICAL FEATURES

ParticularsDetails
WTG modelS 97-120
WTG Rating2100 kW
Hub Height  120 m
Rotor diameter  97 m
Pooling sub-station near the wind farmGunda Pooling Substation - 132 /33 kV, 3x50 MVA 
Bajana Pooling Substation – 66 /33 kV, 2x25 MVA
Grid Sub-StationBhomiyavadar GETCO Substation &  
Babarzar GETCO Substation
S.No.DescriptionGeneration (MU)
1Generation during August 202620.81
2Cumulative Generation during FY 2026-27 (up to August 2026)87.25