| 11 |
Annual Cleaning of distribution water storage tanks(RCC & Steel) at Bhagirathipuram under Bhagirathipuram water supply scheme |
|
Download (110.72 KB) |
| 12 |
Treatment of slope above Diversion Tunnel Inlet area at left bank from Ch. 0.00M to Ch. 100.00 M and EL 635.00 to EL 642.00 / EL 665.00M with SDRA and high tensile rolled cable net including secondary mess at inlet area of DT at Koteshwar. |
|
Download (1.04 MB) |
| 13 |
Procurement of Conveyor Belts for CHP/LHP/GHP at 2 x 660 MW KSTPP, Khurja |
|
Download (144.56 KB) |
| 14 |
General Notice regarding any Revision / Extension in Tenders |
|
Download (69.16 KB) |